ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Murfeld / Ceršak (Gas Connect Austria > Plinovodi) Unidirectional

120 GWh/d

120 GWh/d

IP Murfeld/Ceršak (AT > SI)

IP Murfeld/Ceršak (AT > SI)

100

100

80

80

60

60

40

40

20

20

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.3.1: Murfeld / Ceršak: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.3.2: Murfeld / Ceršak: Flows and booked capacity vs. technical capacity (daily)

 Arnoldstein / Tarvisio (TAG > Snam Rete Gas) 1) Bidirectional

1,400 GWh/d

1,400 GWh/d

IP TAG Arnoldstein (AT > IT)

IP TAG Arnoldstein (AT > IT)

1,200

1,200

1,000

1,000

800

800

600

600

400

400

200

200

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Figure 4.4.1: Arnoldstein / Tarvisio: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.4.2: Arnoldstein / Tarvisio: Flows and booked capacity vs. technical capacity (daily)

The decrease of the booked capacity corresponds to the entry into force of the CMP provisions.

1) The seasonal increases of technical capacity shown at some interconnecting points are due to the higher consumption during those seasons which reduces the distance travelled by the gas entering that IP and by consequence reduces the loss of pressure thus increasing the available capacity.

Southern Corridor GRIP 2014–2023 |

57

Made with