ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Murfeld / Ceršak (Gas Connect Austria > Plinovodi) Unidirectional
120 GWh/d
120 GWh/d
IP Murfeld/Ceršak (AT > SI)
IP Murfeld/Ceršak (AT > SI)
100
100
80
80
60
60
40
40
20
20
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.3.1: Murfeld / Ceršak: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.3.2: Murfeld / Ceršak: Flows and booked capacity vs. technical capacity (daily)
Arnoldstein / Tarvisio (TAG > Snam Rete Gas) 1) Bidirectional
1,400 GWh/d
1,400 GWh/d
IP TAG Arnoldstein (AT > IT)
IP TAG Arnoldstein (AT > IT)
1,200
1,200
1,000
1,000
800
800
600
600
400
400
200
200
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Figure 4.4.1: Arnoldstein / Tarvisio: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.4.2: Arnoldstein / Tarvisio: Flows and booked capacity vs. technical capacity (daily)
The decrease of the booked capacity corresponds to the entry into force of the CMP provisions.
1) The seasonal increases of technical capacity shown at some interconnecting points are due to the higher consumption during those seasons which reduces the distance travelled by the gas entering that IP and by consequence reduces the loss of pressure thus increasing the available capacity.
Southern Corridor GRIP 2014–2023 |
57
Made with FlippingBook