ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Gorizia / Šempeter (Snam Rete Gas > Plinovodi) Unidirectiona l
GWh/d
GWh/d
IP Gorizia/Šempeter (IT > SI)
IP Gorizia/Šempeter (IT > SI)
30
30
25
25
20
20
15
15
10
10
5
5
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Figure 4.5.1: Gorizia / Šempeter: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.5.2: Gorizia / Šempeter: Flows and booked capacity vs. technical capacity (daily)
Rogatec (Plinovodi > Plinacro) Unidirectional
GWh/d
GWh/d
IP Rogatec (SI > HR)
IP Rogatec (SI > HR)
70
70
60
60
50
50
40
40
30
30
20
20
10
10
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Figure 4.6.1: Rogatec: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.6.2: Rogatec: Flows and booked capacity vs. technical capacity (daily)
58 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook