ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Lanžhot (eustream > NET4GAS) Bidirectional
1,400 GWh/d
1,400 GWh/d
IP Lanžhot (SK > CZ)
IP Lanžhot (SK > CZ)
1,200
1,200
1,000
1,000
800
800
600
600
400
400
200
200
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.7.1: Lanžhot: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.7.2: Lanžhot: Flows and booked capacity vs. technical capacity (daily)
The important reduction of the technical capacity was the consequence of a similar reduction made in the Import Point of Velké Kapušany (see below).
Baumgarten (eustream > BOG, Gas Connect Austria and TAG) Bidirectional
1,800 1,600 1,400 1,200 1,000 GWh/d
1,800 1,600 1,400 1,200 1,000 GWh/d
IP Baumgarten (SK > AT)
IP Baumgarten (SK > AT)
800 400 200 600
800 400 200 600
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.8.1: Baumgarten: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.8.2: Baumgarten: Flows and booked capacity vs. technical capacity (daily)
Southern Corridor GRIP 2014–2023 |
59
Made with FlippingBook