ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Lanžhot (eustream > NET4GAS) Bidirectional

1,400 GWh/d

1,400 GWh/d

IP Lanžhot (SK > CZ)

IP Lanžhot (SK > CZ)

1,200

1,200

1,000

1,000

800

800

600

600

400

400

200

200

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.7.1: Lanžhot: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.7.2: Lanžhot: Flows and booked capacity vs. technical capacity (daily)

The important reduction of the technical capacity was the consequence of a similar reduction made in the Import Point of Velké Kapušany (see below).

Baumgarten (eustream > BOG, Gas Connect Austria and TAG) Bidirectional

1,800 1,600 1,400 1,200 1,000 GWh/d

1,800 1,600 1,400 1,200 1,000 GWh/d

IP Baumgarten (SK > AT)

IP Baumgarten (SK > AT)

800 400 200 600

800 400 200 600

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.8.1: Baumgarten: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.8.2: Baumgarten: Flows and booked capacity vs. technical capacity (daily)

Southern Corridor GRIP 2014–2023 |

59

Made with