ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Csanádpalota (FGSZ > Transgaz) Bidirectional

GWh/d

GWh/d

IP Csanádpalota (HU > RO)

IP Csanádpalota (HU > RO)

60

60

50

50

40

40

30

30

20

20

10

10

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Figure 4.13.1: Csanádpalota: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.13.2: Csanádpalota: Flows and booked capacity vs. technical capacity (daily)

Dravaszerdahely (FGSZ > Plinacro) Unidirectional

GWh/d

GWh/d

IP Drávaszerdahely (HU > HR)

IP Drávaszerdahely (HU > HR)

90

90

80

80

70

70

60

60

50

50

40 30 20 10

40 30 20 10

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Figure 4.14.1: Dravaszerdahely: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.14.2: Dravaszerdahely: Flows and booked capacity vs. technical capacity (daily)

This IP has been designed as bi-directional but presently offers capacity only in the direction HU > HR at about 40% of design capacity. Subject to a pressure management agreement between the two TSOs and an increased use of FGSZ CS the IP could operate at about 60% of design capacity in both directions. The full bi-directional capacity will be made available after the installation of a CS on the Croatian side.

62 |

Southern Corridor GRIP 2014–2023

Made with