ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Uzhgorod / Velké Kapušany (Ukrtransgaz > eustream)

3,500 GWh/d

3,500 GWh/d

IP Ve ľ ké Kapušany (UA > SK)

IP Ve ľ ké Kapušany (UA > SK)

3,000

3,000

2,500

2,500

2,000

2,000

1,500

1,500

1,000

1,000

500

500

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.17.1: Uzhgorod / Velké Kapušany: Flows versus technical capacity (physical congestion considerations)

Figure 4.17.2: Uzhgorod / Velké Kapušany: Flows and booked capacity vs. technical capacity (daily)

The important reduction of the technical capacity was made in order to allow for a more efficient operation of the compressor station, given the reduced use of the IP by shippers.

Beregdaróc (Ukrtransgaz > FGSZ)

GWh/d

GWh/d

IP Beregdaróc (UA > HU)

IP Beregdaróc (UA > HU)

700

700

600

600

500

500

400

400

300

300

200

200

100

100

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.18.1: Beregdaróc: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.18.2: Beregdaróc: Flows and booked capacity vs. technical capacity (daily)

64 |

Southern Corridor GRIP 2014–2023