ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Uzhgorod / Velké Kapušany (Ukrtransgaz > eustream)
3,500 GWh/d
3,500 GWh/d
IP Ve ľ ké Kapušany (UA > SK)
IP Ve ľ ké Kapušany (UA > SK)
3,000
3,000
2,500
2,500
2,000
2,000
1,500
1,500
1,000
1,000
500
500
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.17.1: Uzhgorod / Velké Kapušany: Flows versus technical capacity (physical congestion considerations)
Figure 4.17.2: Uzhgorod / Velké Kapušany: Flows and booked capacity vs. technical capacity (daily)
The important reduction of the technical capacity was made in order to allow for a more efficient operation of the compressor station, given the reduced use of the IP by shippers.
Beregdaróc (Ukrtransgaz > FGSZ)
GWh/d
GWh/d
IP Beregdaróc (UA > HU)
IP Beregdaróc (UA > HU)
700
700
600
600
500
500
400
400
300
300
200
200
100
100
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.18.1: Beregdaróc: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.18.2: Beregdaróc: Flows and booked capacity vs. technical capacity (daily)
64 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook