ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Jidilovo (Bulgartransgaz > GA-MA) Unidirectional
40 30 35 25 20 15 10 5 GWh/d
40 30 35 25 20 15 10 5 GWh/d
Jidilovo (BG > MK)
Jidilovo (BG > MK)
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.24.1: Jidilovo: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.24.2: Jidilovo: Flows and booked capacity vs. technical capacity (daily)
Beregdaróc (FGSZ > Ukrtransgaz 1) ) Bidirectional
GWh/d
GWh/d
IP Beregdaróc (HU > UA)
IP Beregdaróc (HU > UA)
160 120 140 100
160 120 140 100
80 60 40 20
80 60 40 20
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Booked non interruptible + interruptible Capacity Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Figure 4.25.1: Beregdaróc: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.25.2: Beregdaróc: Flows and booked capacity vs. technical capacity (daily)
1) Only interruptible capacity is offered at the Beregdaróc IP in the direction from Hungary to Ukraine.
68 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook