ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Jidilovo (Bulgartransgaz > GA-MA) Unidirectional

40 30 35 25 20 15 10 5 GWh/d

40 30 35 25 20 15 10 5 GWh/d

Jidilovo (BG > MK)

Jidilovo (BG > MK)

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Technical Capacity

Figure 4.24.1: Jidilovo: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.24.2: Jidilovo: Flows and booked capacity vs. technical capacity (daily)

Beregdaróc (FGSZ > Ukrtransgaz 1) ) Bidirectional

GWh/d

GWh/d

IP Beregdaróc (HU > UA)

IP Beregdaróc (HU > UA)

160 120 140 100

160 120 140 100

80 60 40 20

80 60 40 20

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Booked non interruptible + interruptible Capacity Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Figure 4.25.1: Beregdaróc: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.25.2: Beregdaróc: Flows and booked capacity vs. technical capacity (daily)

1) Only interruptible capacity is offered at the Beregdaróc IP in the direction from Hungary to Ukraine.

68 |

Southern Corridor GRIP 2014–2023