ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Cavarzere (Terminale GNL Adriatico > Snam Rete Gas and Infrastrutture Trasporto Gas)
GWh/d
GWh/d
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
350
350
300
300
250
250
200
200
150
150
100
100
50
50
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Technical Capacity
Average daily
Flow Range
Flow
Technical Capacity
Figure 4.27.1: Cavarzere: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.27.2: Cavarzere: Flows and booked capacity vs. technical capacity (daily)
\\ Booked capacity is not, in this case, a useful indicator for the capacity adequacy analysis, as in Italy the terminal operators reserve capacity in the transmission system on behalf of their users. \\ The Offshore LNG Toscana (OLT) terminal was commissioned in the last quarter of 2013 therefore no historical data are available for the time window examined.
Revythoussa (DESFA > DESFA)
GWh/d
GWh/d
IP Revythoussa (LNG > GR)
IP Revythoussa (LNG > GR)
160 120 140 100
160 120 140 100
80 60 40 20
80 60 40 20
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Figure 4.28.1: Revythoussa: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.28.2: Revythoussa: Flows and booked capacity vs. technical capacity (daily)
70 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook