ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Cavarzere (Terminale GNL Adriatico > Snam Rete Gas and Infrastrutture Trasporto Gas)

GWh/d

GWh/d

IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)

IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)

350

350

300

300

250

250

200

200

150

150

100

100

50

50

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Technical Capacity

Average daily

Flow Range

Flow

Technical Capacity

Figure 4.27.1: Cavarzere: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.27.2: Cavarzere: Flows and booked capacity vs. technical capacity (daily)

\\ Booked capacity is not, in this case, a useful indicator for the capacity adequacy analysis, as in Italy the terminal operators reserve capacity in the transmission system on behalf of their users. \\ The Offshore LNG Toscana (OLT) terminal was commissioned in the last quarter of 2013 therefore no historical data are available for the time window examined.

Revythoussa (DESFA > DESFA)

GWh/d

GWh/d

IP Revythoussa (LNG > GR)

IP Revythoussa (LNG > GR)

160 120 140 100

160 120 140 100

80 60 40 20

80 60 40 20

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Average daily Technical Capacity Booked non interruptible + interruptible Capacity

Flow

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Figure 4.28.1: Revythoussa: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.28.2: Revythoussa: Flows and booked capacity vs. technical capacity (daily)

70 |

Southern Corridor GRIP 2014–2023