Cityworks SR and WO

U fO

.:J

.:J

Category:

Entit'l Group: Water

r Object

r Other

r. Feature

~ FlllSh

~

Control Valve lili Manhole Pressurized Main

Install new Paint Re air Replace

.:::J Farm,.D .:J

.:::J p .:J Ll

l

Statu s:

Open

Prioritv:

Medium

.:J

GUNTER, BOBBY 0

GUNTER, BOBBY D

Requested By:

Super... isor:

T:J Projected Start: 315120133:06 PM

Submit To: ROBERTS, GUY F

~

.::J

d

Stage: klual

Expense TVpe: Mainlenance

Comments:

Instruction s:

3. Select an Elltity Group from the drop-down list.

4. Click the Features radio button.

5. Select the asset type from the list on the left. Work order templates associated with the asset type will display on the right when the asset type is selected.

6. Click on the desired maintenance activity from the list on the right.

7. Fill out the desired fields on the General panel.

l id Create

I.

8. Click

The work order will display.

9. If desired, type a description of the work location in the Location Details box of the Location Information panel. Even though this work order is not attached to an asset, it's helpful to have some information about the type of work being done.

I

10. Click [ ld Save

Server AMS 2013 SPl End User Training Manual

Section 5: The Work Order 0 85

Made with