Cityworks SR and WO
• Projected start date and projected finish date • Opened by and date, closed by and date, completed by • Actual start date, actual finish date, stage of the work order, and expense type • Existing comments or instructions related to the work order • Resolution and reactive information
fII0 1f!f: If you've selected multiple assets for a work order created from a work order template class, a work order will be created for each asset. They will be displayed in the fIIum~r drop-down list on the Work Order panel.
The Details Panel
~
Account:
Project:
I
I±I LJ Project Tree
l::J
~
Contract:
Contractor:
r r
r r
Legal Billable:
Contractor Billable:
Cancel Work Order:
Update Map:
~
Cancelled By:
Date:
Cancel Rea so n:
r::J
Units Accomp.:
Description:
r
Lock Units Desc.:
Labor Cost: $68 . 16
Material Cost; $255 . 00
Permit Cost: $0 .00
Equipment Co s t: $837 . 50
Total WO Costt $1 , 160 .66
The Details panel displays detailed information about the work order when:
• The work order is tied to a project and the Project Tree • The work order has a manually assigned account number • The work order is tied to a specific contract • The work order is legally billable, or if it will be billed by a contractor • The GIS needs to be updated to match an actual field observation • The work order is cancelled, who cancelled it, and when • Units accomplished and description
The following fields are populated according to data entered in the Equipment, Labor, Materials, and Permit panels:
• Labor cost
Section 5: The Werl( Order 0 89
Server AMS 2013 SPl End User Training Manual