Cityworks SR and WO

• ••

",.

..:J Repair Hydrant

Work Order 10: 28

rActua l r.Estimated

r r

Units Cost

Materi,lld

Description

HardHat221

Heavy ballistic IlOrd hat

1.00

$122.00

r LeatherGlov.,S399 Heavy' leathergloves with steel joint protection 0.50

$82.50

.1

1

~i

I filA

II Delele

II Transfer

I New

~ .m. . Iilitiai

....

.:J

~

Storeroom: NIA

Search By:

I Find

I

Keyword:

r r r

Description

Unit Unit Cost

UID

Heavy ballistic hard hat

HardH.t221

EA

122.00

L"therGlovesS899

165.00

PI

Heavy leather gloves with steel joint protection

· 1

~J

1

r. Asset s r Tasks r r .1 I Asset

A",tId

Work Co

Warranty Date

Location

WHYDRANT

0

False

~

1

I

Highlight Selected Assets

2. At the top of the Material panel, select either the Actual or Estimated radio button. By default, the Actual radio button is selected . NOTE: If material has been added as an EstImated entry, it can be copied to Jlctual by clicking the Estimated radio button and then clicking on the Estimated material entry to highlight it and then clicking ryan" " . This copies the Estimated material to the Actual material panel. 3. In the Material/Entity/Task panel, select the desired material by checking the box to the left to highlight it. You can also search for material by name, predefined list, crew, my crew, or hierarchy. NOTe: If the desired material is not shown, make sure that the Vlewsble In Server check box for that material is cllecked in Designer. 4. To associate the material with assets or tasks, select the Assets or Tasks option in the Material/Entity/Tasl( panel. Highlight the desired material and select the asset(s) or task(s) to associate to the material. If the Assets option is selected, click Highlight Selected Assets to mark the selected asset(s) on the map.

5. Once the material has been highlighted, enter the material details in the Details panel.

100 0 Section 5: The Work Order

Server AMS 2013 SP1 End User Training Manual

Made with