6. Click I Sav, The material and all of the information associated with it will display in the Materials panel.

To add material that was provided by a contractor, follow these steps:

1. Check the box by the desired material from the Material/Entity/Task panel.

2. In the Contractor Material panel, enter the details of the material.

I S, v,

I.

3. Click

Contractor ~1aterial

...

~

Contractor:

I±l 0 Contractors

Id,

Description:

IffiI

Date:

Account:

.... 1

o

Units:

Cost:

$0.00

Save

To delete material from the work order,

1. Check the box next to the material in the Material panel.

2. Click I D,'", Costs for the material are displayed in the Details panel of the default work order view.

I ,"Work

or~ to view the work order. The material costs will be displayed on the Details

1. Click

panel.

The Work Order Equipment View

You can add, view, and edit equipment on the work order. . 1. To add Equtpment to the work order, click

. \..e Equipment

under I View' ) on the toolbar.

Section 5: The Worle Order 0 101

Server AMS 2013 SP1 End User Training Manual