Cityworks SR and WO

~

~

ilm

Fini sh Date:

~

Start Date:

o

Units:

Hours:

Account: I

~ I

---

Sav(!

I $,v,

6. Click

The equipment and all of the information associated with it will display in the Equ ipment panel.

To add equipment that was provided by a contractor, fol low these steps:

1. Check the box by the desired equipment from the Equipment / Entity/Tasl< panel.

2. In the Contractor Equipment panel, enter the details of the equipment.

I Save

I.

3. Click

. (Sj

Qj

..:J

Contractor:

I±I LJ Contr.ctors

[do

Description:

I@I

~

End Date:

Start Date:

Units:

Hours:

0

H

I

Cost:

Account:

Save

- -- - ----

To delete equipment from the work order,

1. Check the box to the left of the equipment record in the Equipment panel.

2. Click I De'", '. Costs for the equipment are displayed in the Details panel of the default work order view.

ord~ to view the work order. The equipment costs will be displayed on the Details

1. Click r" work

panel.

The Work Order ELM View

ELM stands for Equipment, Labor, Materials, and is a way to quickly add eqUipment, labor, and material to a work order. Before ELM can be used, the crews must be configured in Server. NOTE: Only the user who creates the crew will be able to view that crew.

Section 5: The Work Order a 103

Server AMS 2013 SPl End User Training Manual