Cityworks SR and WO

"-

liltfi;ff~

fflil

dID

Start Date:

Finish Date:

o

Units:

Hours:

ยท 1

Account: t --

Save

I $>v,

6. Click

The equipment and all of the information associated with it will display in the Equipment panel.

To add equipment that was provided by a contractor, follow these steps:

1. Check the box by the desired equipment from the Equipment/Entity/Task panel.

2. In the Contractor Equipment panel, enter the details of the equipment.

I Saw

I.

3. Click s -- .. ----

a]

rw;iim~brQ 'u!id'?

-- .:1

Contractor:

IB LJ Contractors

Id,

Description:

Start Date:

End Date:

~

~

o o

Hours:

Units:

I

Cost:

Account:

Save

To delete equipment from the work order,

1. Check the box to the left of the equipment record in the Equipment panel.

I D,'", ;.

2. Click

Costs for the equipment are displayed in the Details panel of the default work order view.

1. Click 1 ,"Work order] to view the work order. The equipment costs will be displayed on the Details panel.

The Work Order ELM View

ELM stands for Equipment, Labor, Materials, and is a way to quickly add equipment, labor, and material to a work order. Before ELM can be used, the crews must be configured in Server. NOTE: Only the user who creates the crew will be able to view that crew.

Section 5: The Work Order 0 103

Server AMS 2013 SPl End User Training Manual