Cityworks SR and WO

li

II Equipment

J

A~5ets/Ta:;ks

Labor ~ r·tlaterial

De lete

Group

Account

Name

Hours 40

O ld 0 3 0 3 0 3

GUNTER, BOBB ..

GUNTER, BOBB ..

2 6

ROBERTS, GUY F

~

2. Check the check boxes next to the items to be deleted.

3. Click Delete

I S,v.

4. Click

The War" Order Line Item View

Line Items is related to Cityworks Server Contracts, which is an add-on product that is not covered in this training.

..:J Repair Manhole

r Reported rEstimated

r. Actual

Work Order W I 3

Contract Number Item Number

Description

Asset Type

Assetld

Task Name

Verification

UnltsUsed

Cost

-I ~I

..:J [

I I Upd<.Ii!Vi!I~mlioo

.::J

(lelill!

History

[ Mc.veIOCoI"IlllCi

OP'!I"I Conl/itel

The Warl' Order Read ings View

Work orders can be generated by asset readings rather than just relying on the time calculations in cyclical work orders. Readings can be obtained for individual assets and linked to work order templates to automatically generate a work order when the defined intervals, milestones, or thresholds are exceeded . Vehicle maintenance can be set up if vehicles are defined as features or related objects tied to a shop location or building . NOTE: Assets must be configured in Designer by the domain administrator in order to access work order asset readings.

Section 5: The Work Order 0 107

5C1ver AMS 2013 5P1 End User Training Manual

Made with