AOAC SPDS Meeting Book March 19 2015
Mitragyna Speciosa Group Work to Date
• 1 In Person Meeting
• 2 teleconferences (October 2014 – November 2014)
• 1 SMPR Drafted
• Public comment period (December 15 2014 , – January 30, 2015) • SMPRs made ready for SPDS review and approval
Background (Agency History)
• 2006 (street drug language in labeling) • 2011 – Develop tox regulatory strategy for “low hanging fruit” using NDI adulteration charge No safety data or safety concern based on MOA “ l h”/ ll d Lega Hig Centra y Active Ingre ients
Analysis of importation • 2012 – Dietary Supplement (54) Import Bulletin written for Kratom • Thousands of kilos of kratom detained/refused (between 2012 and Present) • “Operation Log Jam” – not a massive nationwide crackdown on kratom S S di i (S 2014) K ld b h i di • PD Pre ct on ept 5, : ratom wou e t e ngre ent of 2014 and 2015 • September 25, 2014 – U.S. Marshals seized 25,000 lbs raw Kratom (> $5M) Today • Kratom is adulterated to CFSAN FDA because of the alkaloids • NDI filing would receive a “Not a Dietary Ingredient Letter”
Made with FlippingBook