STEAM GENERATOR & FLUID HEATER INSTALLATION MANUAL

the SE coil assembly and the feedwater inlet, allowing it to rest on the main outer shell below. Using a set of self-locking clamps, Vise-Grip ® pliers for example, clamp the SE outer shells to the main outer shell. b. Lift the remaining outer shell piece into place. Screw the two shell ends together. Align the assembled SE outer shells with the main outer shells below. c. Install the outer clamp bands around the main outer shell flange and the SE outer shell flange. Secure the clamp bands with their attaching hardware. d. Install the outer heater cover in the same manner as the inner heater cover was installed. Refer to steps f and g in the previous section. e. Install the patch plates around the feedwater inlet piping and the feedwater dis- charge piping. Install Piping a. Pre-assemble the SE Kit feedwater supply and feedwater discharge piping and flanges. b. Install the pre-assembled SE piping to the feedwater supply side and the feed- water discharge side of the machine, as shown in Figures 2 and 3.

IMPORTANT Before starting the steam generator/fluid heater, verify all piping connections, outer shell assemblies, and clamp bands are secure.

Check Completed SE Kit Installation a. Start and fill the heating unit without burner operation. See the filling proce- dure in Section IV of the Steam Generator/Fluid Heater Instruction Manual. b. Check for leakage around connections of the newly installed SE Kit piping. c. Boil out SE coil using soft water. See the “Conditioning of New Installations” procedure in Section III of the Steam Generator/Fluid Heater Instruction Man- ual. The machine should be ready to be placed into regular operation at this point.

NOTE Some parameters of the control system may require adjustment with the added SE Kit. Consult your Clayton Service Representative for further details.

D-26

Appndx_SE Option_xx4_c.fm

04/22/2015