SEPTEMBER 2016 BEACON

North Channel Yacht Club General Membership meeting

(2) Overhead projector screens

Thank you Frank for the installation, we are utilizing them today for his financial presentation.

(3) WI-FI cameras Put on hold to cover the cost of the bar. Signs on all the wells Put on hold to cover the cost of the bar. New pizza oven Thank you to the Ancient Mariners for the donation of the oven and to Ron Draper for installing the Thank you to the Ancient Mariners for the donation of the unit. Thank you to Ron Kemp and Ed Romatz for the beautiful handmade mounting of the readout unit. I don’t know if you have seen it yet, but Ron also built us a new NCYC clock that is hanging in the bar. He did an awesome job and I am proud to have it. Additional water to island pedestals Thank you to the Ancient Mariners for the donation of the water piping and to the many helping hands that worked alongside Bill Calihan doing the installation. Bill and Scotty Bell spent several weekdays on top of the Elite Brigades and work parties on the island to ensure this project was completed. Boatique Doors The Boatique is looking better than ever with the new double entry doors out to the patio area thanks to P/C Rick Romatz and Bill Calihan, and the entry door looks brand new with the professional refinish job done by the dynamic duo of Ron Kemp and Ed Romatz. Thanks to all of you for the fine work. Old Kid’s Room The old kid’s room space First Mates renovation looks amazing. If you haven’t seen it yet, you need to go and take a look. Thank you First Mates. Additional maintenance improvement projects In the 2016 budget, we increased the Harbor & Grounds and Clubhouse maintenance budgets to get some sorely needed maintenance upgrades done. The first aid room has been transformed to sleeping room #6. All first aid equipment and supplies are now located in the vestibule going out to the flag area. The first aid cabinet has a tamper seal on the door. If you have to break the seal please let the Manager know so the items you took can be replaced and available for the next person in need. We have improved the safety of getting on and off the boats on D dock as well as along the Robison by expanding the dock size. We rebuilt the failing deck between the clubhouse and the pavilion. electrical service to it. New weather station

Made with