2018 - 2022 Financial Plan Online Interactive
DRAINAGE
PUBLIC SAFETY
Work with the City of Langley and Township of Langley to address current and future floodplain conditions in the Upper Nicomekl River area.
Work with Port Metro Vancouver/Fraser Surrey docks on a coordinated flood response and long term flood protection plan for the west end of the Fraser River; Improve flood protection through upgrading the Colebrook and Fraser River dyke systems; and
ECONOMIC PROSPERITY & LIVELIHOODS
Improve drainage in agricultural areas through construction of new pump stations and low level pumps (Colebrook, Hook Brook, Burrows, Halls Prairie and Panorama).
ECOSYSTEMS
Continue with determining relevant monitoring stations in watercourses to establish trend monitoring for salmonid spawners; and Updated the Erosion and Sediment Control Bylaw to better enable compliance by builders involved with single-family home construction.
Develop and implement financial strategy for the Biodiversity Conservation Strategy in order to acquire natural areas and connections between natural areas; Improve fish passage and drainage maintenance through upper Chantrell through the replacement of man-made pond fish ladder structures with a natural creek;
12 Avenue Bridge at 18100 Block
the future lives here.
2018-2022 Financial Plan
- 263 -
Made with FlippingBook - Online magazine maker