Sample Pump - TC
Design Information GPM
Calculated Design Information Discharge Pressure (ft) 84.0 Suction Pressure (ft) 22.0 VFD Hz 60.0 VFD Volts 480 VFD Amps 3.7
125
FTH
60.0
Pump Efficiency
66.0%
Motor HP Motor BHP VFD Volts VFD Amps
5.0 2.8
480
6.2
Performance Data GPM
128
FTH
62.0
VFD BHP
3.0
Sample UPS
Design Information UPS Size kVA
Performance Readings Battery Voltage Start Battery Amps Start Battery Voltage Stop
1500 1,500
494
UPS Size kW
3,030
UPS Power Factor Inverter Efficiency 94.8% UPS Rectifier kW 1,582 Battery Runtime 5 Battery Amp Hrs 155.0 Required Watt Hrs 131,857 Required Watt/Cell 1,010 Battery Watt/Cell 1,010 # of Battery Strings 4 Batteries/String 30 # of Cell/Battery 2 Battery Cell Voltage 12 Cutoff Volt/Cell 1.67 Low Voltage Cutoff 400.80 Battery SG 1.25 1.0
401
Bypass Switch
Battery Amps Stop 3,740 Batt. Discharge Start 2:30:00 PM Batt. Discharge Stop 2:36:00 PM UPS Rm. Temp °F 72.0
Rect
Inv
Performance Calculations Operating kW
1499.8 100.0% 1582.0
Batt
Percent Load Rectifier kW
Required Watt/Cell UPS Output Volts UPS Output Amps Voltage Unbalance
6,592 480.9
1,800.5
0.06% Amperage Unbalance 0.03% Estimated Runtime 6 Actual Runtime 6
Level 6 — Turnover & Occupancy Scope and Objectives: Compile Level 1–5 closeout ar tifacts, finalize issues log, deliver training, O&M man uals, systems manuals, and the Final Commissioning Report; complete lessons‑learned and readiness walks; plan any seasonal/deferred tests; and establish definition of “Commissioning Complete.” Technical Commissioning Activities: Validate KPI trends (e.g., energy and reliability metrics) and embed optimization findings into SOPs/EOPs/MOPs and op erator training so that performance gains persist into operations.
failure scenarios (e.g., utility loss, equipment fail ure, single‑point challenges) at multiple load levels, with no active human intervention, to verify auto matic response and overall performance/reliability. Prerequisite: all Level 4 testing passed with issues closed. Technical Commissioning Activities: Facility‑scale performance validation—coincident power/cooling re sponse, transient behavior, and reliability objectives— supported by synchronized metering, long‑duration trending, and rapid defect triage/retest cycles as di rected by the CxA.