2023-2027 Capital Improvement Plan
thru 2023 2027
Capital Improvement Plan City of Shakopee, Minnesota
Department Storm Drainage Fund
Contact Public Works Director
Type Improvement
Project #
Storm-24-001
Useful Life
Project Name West End Regional Pond and Trunk Oversizing
Category Storm Sewer/Drainage
Priority 2 Important-Provide Efficienci
Accounting Code
Status Active
Fund Surface Water Fund
Description Oversizing of ponds and storm sewer for managing offsite stormwater runoff that will be coordinated with development. Total Project Cost: $450,000
Justification I t is important to control rates to manage the stormwater system and protect/reduce the potential for flooding in the downstream stormwater system.
Expenditures
Total
2023
2024
2025
2026
2027
Construction/Maintenance
400,000
400,000
Engineering/Administration
50,000
50,000
450,000
450,000
Total
Funding Sources
Total
2023
2024
2025
2026
2027
Storm Drainage Fund
450,000
450,000
450,000
450,000
Total
Budget Impact/Other The oversizing of ponds and pipes will be coordinated with development. A feasibility study by Stantec partially funded through WBF was completed to determine if there is a water quality benefit opportunity with oversizing. As a result of the study, it was identified that there is not a water quality benefit to consider with the oversizing.