2023-2027 Capital Improvement Plan

thru 2023 2027

Capital Improvement Plan City of Shakopee, Minnesota

Department Storm Drainage Fund

Contact Public Works Director

Type Improvement

Project #

Storm-25-002

Useful Life

Project Name Blue Lake Channel (West) Regional Storm Pond

Category Storm Sewer/Drainage

Priority 2 Important-Provide Efficienci

Accounting Code

Status Active

Fund Surface Water Fund

Description Regional best management practice located west of CSAH 83 to implement for rate control, flood protection, and water quality. Total Project Cost: $700,000

Justification It is important to control rates to manage the stormwater system and protect/reduce the potential for flooding in the downstream stormwater system. It also provides water quality benefit by reducing sediment and phosphorus to help meet water quality goals and NPDES MS4 requirements.

Expenditures

Total

2023

2024

2025

2026

2027

Construction/Maintenance

610,000

610,000

Engineering/Administration

90,000

90,000

700,000

700,000

Total

Funding Sources

Total

2023

2024

2025

2026

2027

Storm Drainage Fund

700,000

700,000

700,000

700,000

Total

Budget Impact/Other Construction of ponding would be done with development. A feasibility study that evaluated flooding was completed by WSB in 2014. An AUAR was completed by Stantec for this area. A feasibility study by Stantec partially funded through WBF was completed to determine if there is a water quality benefit opportunity with oversizing. The study did identify that there are opportunities with water quality benefits.