Project Details Report Arbor Bluff Stream Stabilization and Regional Pond Project Name Arbor Bluff Stream Stabilization and Regional Pond Project # Storm-25-002
Total Project Cost $750,000
City Engineer Improvement 2 - Smart to do
Contact
Storm Drainage Fund Storm Sewer/Drainage
Department
Type
Category
Priority
Active
Surface Water Fund
Status
Fund
Description
Phase 1 of this project includes restoration to the Blue Lake Channel tributary within the bluff adjacent to the Arbor Bluff development. The steep section within the bluff is experiencing erosion and needs to be restored and stabilized. This project is in coordination with the adjacent residential development and trail improvements which are planned to be constructed prior to completing the development.
Phase 2 is a regional best management practice located west of CSAH 83 to implement for rate control, flood protection, and water quality. The timing of this phase is dependent on development.
Justification
It is important to restore and stabilize the channel to protect adjacent infrastructure and property. The regional best management practice is important to control rates to manage the stormwater system and protect or reduce the potential for flooding in the downstream stormwater system. These projects also provide water quality benefit by reducing sediment and phosphorus to help meet water quality goals and NPDES MS4 requirements.
Expenditures
2027
2028
2029
2030
2031
Total
Construction/Maintenance
675,000
0 0
0 0
0 0
0 0
675,000
Engineering/Administration
75,000
75,000
750,000
0
0
0
0
750,000
Total
Funding Sources
2027
2028
2029
2030
2031
Total
Storm Drainage Fund
750,000
0
0
0
0
750,000
750,000
0
0
0
0
750,000
Total
Budget Impact
Restoration and construction for this project would be coordinated with the timing of adjacent development. A feasibility study that evaluated flooding was completed by WSB in 2014. An AUAR was completed by Stantec for this area. A feasibility study by Stantec partially funded through Watershed Based Implementation Funding was completed to determine if there is a water quality benefit opportunity with oversizing. The study did identify that there are opportunities for water quality benefits with the regional system to be incorporated with development.