BuyLog Flippingbook JUN 2024

METERING, BUYLOG SECTION 2

2-56

— ReliaMod™ Mid-rise and high-rise applications

ABB ReliaM

Traditional solution

ABB ReliaMod TM feed through lug module solution

Traditional solution

Meter center

Meter center

Standard cable/ conduit run through the building Feed through Standard main lug module on top floor/feed through not needed

Busway PTO

module Standard

Standard cable/ conduit run through the building

Vertical busway run through the building

Standard feed-in and feed-out

Busway PTO

module main lug

modules main lug

Standard feed-in and feed-out

Feed through module main lug

Busway PTO

modules main lug

Standard feed-in and feed-out

Feed through module main lug

Busway PTO

modules main lug

Switchboard or disconnet ahead of meter centers

Switchboard or disconnect ahead of meter centers

Switchboard or disconnect ahead of meter centers

Standard main lug modules to feed up through the floors takes up more space

Utility transformer

Utility transformer

Utility transformer

ABB ReliaMod™ feed through lug module solution

ABB ReliaMod™ Busway Power Take Off (PTO) solution ABB ReliaMod TM Busway Power Take Off (PTO) Solution

ABB ReliaMod TM Busway Power Take Off (PTO) Solution

ABB ReliaMod TM feed through lug module solution

Traditional solution

ABB ReliaMod TM feed through lug module solution

onal solution

Meter center

Meter center

Meter center

Meter center

Meter center

Meter center

Standard cable/ conduit run through the building Feed through Standard main lug module on top floor/feed through not needed

Standard cable/ conduit run through the building Feed through Standard main lug module on top floor/feed through not needed

Busway PTO

module ndard

Busway PTO

ndard n and d-out dules in lug cable/ uit run gh the uilding

Vertical busway run through the building

Vertical busway run through the building

Vertical busway that utilizes ABB’s Busway Power Take (PTO) breaker solution to feed the meter centers on each floor, reduces the amount of enclosures needed and saves space in the electrical room and time of installation. ABB meter stacks can be mounted on either side of the busway PTO. ABB ReliaMod™ Busway PTO’s are available in 3-phase

Busway PTO

Busway PTO

module main lug

module main lug

ndard n and d-out odules in lug

ABB’s feed through main lug modules reduce the amount of enclosures needed saving space in the electrical room and time of installation. ABB meter stacks can be mounted on either side of the main module. ABB ReliaMod™ feed through lug modules are available in 1200A, 1600A and 2000A models in both 1-phase and 3-phase

Feed through module main lug

Feed through module main lug

Busway PTO

Busway PTO

ndard in and ed-out odules ain lug board onnect meter enters

Feed through module main lug

Feed through module main lug

circuit breaker configurations 250A-1200A

Busway PTO

Busway PTO

Switchboard or disconnet ahead of meter centers

Switchboard or disconnet ahead of meter centers

Switchboard or disconnect ahead of meter centers

Switchboard or disconnect ahead of meter centers

Space saving

Cables/conduit costs saving

Space saving

Utility transformer

Utility transformer

ormer

Utility transformer

Utility transformer

Made with FlippingBook Digital Publishing Software