GE Products BuyLog Smart Catalog
Panelboards A-Series ™ II Panelboard AMP1 Integrated Power and Energy
Section 11
The AMP1 Power & Energy Meter provides a cost-effective inte- grated solution for A-Series* II panelboard power monitoring and submetering applications. With exceptional performance, the AMP1 monitors key electrical parameters of the main power com- ing into the panelboard. This information can then be transmitted to a building automation system (BAS), or similar system, to ana- lyze usage and identify potential cost saving measures. Offering ANSI 12.20 0.5% accuracy, the revenue grade AMP1 meter can be used for tenant billing and cost allocation.
Features —Solutions up to 800A —Revenue Grade, ANSI 12.20 0.2% accuracy —Monitors voltage, amperage, power, and energy —Backlit LCD Display
—Data logging option to ensure data is still preserved locally —Communicates via Modbus® RTU or BACnet – Versatile and widely used protocols. —User-enabled password protection
—UL-67 approved —5-Year warranty —Earn points towards LEED Certification
Meter Type
Product Number
Pulse
AMP1B1 AMP1C2 AMP1C3 AMP1H5
Modbus
Modbus & data logger Bacnet & data logger
Panelboard
TYPE AQ TYPE AE TYPE AS 240V 480Y/277V, 125/250 Vdc 480Y/277V, 125/250 Vdc 800A 800A 800A 65kAIC at 240V 18kAIC at 480Y/277V, 65kAIC at 240V 65kAIC at 480Y/277V, 100kAIC at 240V 200kAIC at 240V 100kAIC at 480V 100kAIC at 480V 600 Amp Max 600 Amp Max 600 Amp Max QB, SE, SF, SG, SK TEY, TEYF, SE, SF, SG, SK TEYD/H/L, SE, SF, SG, SK
Max Voltage
Max Amperage
Fully Rated Series Rated
Main Lug
Main Breakers Branch Breakers
15A-100A, 1P, 2P, 3P QB 15A-100A, 1P, 2P, 3P TEY or TEYF 15A-100A, 1P, 2P, 3P TEYD/H/L
Optional Accessories To add an AMP1 meter to an existing/non-metering panel, enclosure, CTs and fuse kit can be ordered separately.
Current Transformer 1 Amp Rating
Enclosure 2
Fuse Kit 3 AMP1FUSE
Product Number
AMP1N4
100 200 300 400 600 800
AMP1V100A AMP1V200A AMP1V300A AMP1V400A AMP1V600A AMP1V800A AMP1V1000A AMP1V1200A
1000 1200 2000
AMP1V2000A 1 Qty 3 per meter required for three pole breaker applications; qty 2 per meter required for two pole breaker applications.
2 Qty 1 per meter required. 3 Qty 1 per meter required.
Rev. 1/19 Data subject to change without notice
GE Products BuyLog
go.abb/industrial
11-20
Made with FlippingBook - Online magazine maker