Westpoort VCA Eindtermen Basis, VOL, VIL VCU Engels
-
Performing risky tasks
Objective of the work preparation: To determine a working method that is safe and does not cause damage to health
Risky tasks Within the company, the high-risk tasks are recorded on the basis of the RI&E and the (task) risk analysis Points of attention for risky work Rules of conduct (before starting risky work) - Availability and knowledge of the work permit - Availability and knowledge of the (T)RA - Refer to precautionary measures in the client's company regulations - Only start when all conditions have been met - Doing a last minute risk analysis (LMRA) Rules of conduct (in case of deviations from work plan) - Have work stopped - Adjust (task) risk analysis and discuss it with all employees involved - Discuss the adjusted (task) risk analysis with the responsible supervisor and/or client and, if necessary, a prevention employee / safety expert Rules of conduct (for managers during the execution of risky work) - Regularly check whether the work is carried out according to the agreements made - Use agreed control measures - Be sufficiently present - Intervene if there is deviation from the agreements made
Safety aspects -
Time planning for the entire work The order in which the work can be carried out safely What materials, tools and machines are needed to carry out the job safely - The time and measures required to carry out the work in a safe and healthy manner Preventive measures regarding people, organization, technology and the environment Aspects - Human - The organisation - The technique - Area - -
Preventive measure (human aspect) - Acquire knowledge - Possess skills -
Behaviour, e.g. concentrated work, tidy workplace
Preventive measure (organizational aspect) - Efficient working methods - Supervision by managers
Preventive measure (technical aspect) -
Use machines with safe technical design (CE marking).
- -
Maintenance of tools
Ergonomic design
Approach of the intermediary -
Preventive measure (environmental aspect) Safe workplace design that offers optimal protection against environmental stress
Information to the temporary worker about the risky tasks Agreements with the hirer on how the temporary worker will be informed (instructions, training, tests, etc.)
-
Safety aspects in work preparation
Direct causes of an accident or incident Unsafe actions
VCA (SCC) Final objectives | Page 22 of 66
Made with FlippingBook. PDF to flipbook with ease