Govardhan Polepally et al. / Procedia Structural Integrity 52 (2024) 280–292 Govardhan Polepally/ Structural Integrity Procedia 00 (2019) 000 – 000
283
4
Table 1. Bridge details.
Description
Details
The year opened for traffic
1924
No of sans
44 spans
The overall length of the I girder
24.4 m
Span Arrangement Material of span Material of pier Height of the pier
44 x 24.4 m
Steel
Stone Masonry
13 m
4.2. Visual inspection A comprehensive visual inspection was carried out to identify any signs of distress on all the piers and steel girders as there was no past history of assessment, repair, or retrofitting of this bridge. The inspection revealed that there was no scouring at the bottom of the piers or abutments, and all structural elements were found to be in good condition. Additionally, all geometric details of the structure were recorded during the visual inspection and used later for developing numerical models.
Fig. 2. Schematic view and geometric details of masonry bridge (a) Elevation of Masonry bridge (in m); (b) Elevation of masonry pier with two decks (in mm); (c) Side view of the span with piers (in m); (d) Top view of a single span .