EC Meeting November 2018
Quorn Hotel Overall Programme
12/10/2018
DI
2018
2019
April
May
June
July
August
September
October
November
December
January
February
March
April
May
June
Line
Name
9
16
23
30
7
14
21
28
4
11
18
25
2
9
16
23
30
6
13
20
27
3
10
17
24
1
8
15
22
29
5
12
19
26
3
10
17
24
31
7
14
21
28
4
11
18
25
4
11
18
25
1
8
15
22
29
6
13
20
27
3
10
-6
-5
-4
-3
-2
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
1
Initialworks
1
2
BATANDBIRDSURVEY
2
3
ASBESTOSSURVEY
3
SITESETUP INCLUDINGTREEPROTECTIONANDOASISUNITWELFAREPAINTED IVY FENCE
4
4
5
CLIENTREMOVALOFMATERIALS (stored in compoundarea,sheds,garageetc)
5
6
ENGINEERING INITIALSETOUT
6
7
REDUCELEVElSections 1,6AND 4
7
8
BASESFORGARAGEANDCONTAINER
8
9
RELOCATEGARAGEANDCONTAINER
9
10
PERMANANTWELFAREESTABLISHED
10
11
HOTELCARPARKSERVICES/ATTENUATIONETC (Section2phase 1)
11
12
TEMPORARYCARPARKANDPATHS
12
13
REDUCELEVELTOPHASE 1CARPARK (Section2)
13
14
REMOVEWALLS
14
15
REMOVEFENCING
15
16
CLEARVEGITATION
16
17
REMOVEEXISTINGSURFACES
17
18
STONETOROADS
18
19
EXCAVATESERVICETRENCHES
19
20
INSTALLWESTERNPOWER ( subject toAvailability )
20
21
INSTALLELECTRIC
21
22
INSTALLGAS
22
23
WATERTOFIREHYDRANT
23
24
COMMISIONING/TESTING/PURGING/CERTIFICATES
24
25
INSPECTSERVICES
25
26
BACKFILLINGTOSERVICETRENCHES
26
27
EXCAVATEFORATTENUATION
27
28
REMOVEARRISINGS/TIP/LANDSCAPING
28
29
INSTALLATTENUATION
29
30
LAYASSOCIATEDDRAINAGE
30
31
STORMWATERDRAINAGE
31
32
LAYSERVICEDUCTS
32
33
PIPEWORKTONEWFIREHYDRANT
33
34
INSTALLNEWGULLIES/KERBS
34
35
CCTVTODRAINS
35
36
MAKEGOODDISTURBEDAREAS
36
37
CONSTRUCTTEMPORARYBINSTORE
37
38
LAMPPOSTS/BOLLARDS
38
39
FINALSTONE/BLINDING
39
40
INSTALLBLOCKPAVING
40
41
NEWTARMAC
41
42
TIMBERFENCING
42
43
WIREFENCING
43
44
TOPSOIL
44
45
REMOVESITEFENCING
45
46
SNAGGINGHANDOVER
46
47
EXISTINGNURSEYNEWWINGGFTUOFFICE (Section 5)
47
48
Construction
48
49
REMOVEFENCING&POSTS
49
50
DEMOLISH/REMOVEBOUNDARYWALLS
50
51
EXCAVATEFOOTINGS
51
52
INSTALLCLAYBOARDS
52
53
TIE INFOOTINGSTOEXISTING
53
54
REINFORCEMENTTOFOUNDATIONS
54
55
B/CONTROLTO INSPECT (DEPTHSETC )
55
56
CONCRETETOFOUNDATIONS
56
57
HOLDINGDOWNBOLTS
57
58
ERECTSTEELWORK
58
59
SUBSTRUCTURE'S
59
60
FILLCAVITY'S
60
61
EXTERNALSCAFFOLD
61
62
INSTALLNEWDRAINAGETOEXISTINGGROUNDFLOOR
62
63
BEAM&BLOCKFLOORING
63
64
CONSTRUCTSUPERSTRUCTUREWALLS
64
65
INSTALLPADSTONES
65
66
INSTALLSTEELSTOROOF
66
67
FALLARRESTFORNEWSINGLESTOREYROOFS
67
68
FIXWALLPLATES&STRAPS
68
69
FLATROOF JOISTS
69
70
FLATROOFBOARDING
70
71
INSTALLROOF INSULATION/COVERINGS/VENTS
71
72
PARAPETS /CAPPINGS
72
73
INSTALLWINDOWS/DOORS
73
74
INSTALLROOFTRUSSES/BRACING
74
75
INSTALLFASCIA'S&SOFFITS
75
76
ROOFTILING
76
77
RAINWATERGOODS
77
78
EXTERNALRENDER
78
79
INTERNALWALLSTOEXISTING
79
80
INSTALLPATRESSES
80
81
WORKTOFIREALARMS
81
82
FIRSTFIXELECTRICAL
82
83
VENTILATION/PLUMBINGABOVECEILINGS
83
84
ISTFIXMECHANICAL/PLUMBING
84
85
NEWDOORFRAMES
85
86
CAT 6CONTAINMENT/WIRING
86
87
PLASTRERING
87
88
NEWDPM/INSULATION/SCREED
88
89
MAKEGOODFLOORS/LAYTEX
89
90
IPSFRAMING
90
91
FLOORSTOWETAREAS
91
92
INSTALLSANITARYWARE
92
93
ABOVEFLOORDRAINAGE
93
94
CERAMICTILING
94
95
IPSPANELS
95
96
SKIRTINGS/ARCHITRAVES/WINDOWBOARDS
96
97
NEWDOORS/IRONMONGERY
97
98
SECONDFIXELECTRICAL
98
99
PIPEWORKABOVECEILINGS
99
100
TESTING /LAGGINGTOPIPEWORK INCEILINGS
100
101
PLASTERBOARD BULKHEADSTOCEILINGS
101
102
SUSPENDEDCEILINGGRIDS
102
103
LIGHTS/GRILLSVENTSETCTOCEILINGGRIDS
103
104
INSTALLNEWBASEUNITS /TOPS/SINKS
104
105
AIRCONDITIONING
105
106
DECORATIONS
106
107
FLOORFINISHES
107
108
FIXTURES&FITTINGS
108
109
TEST&COMMISIONING
109
110
CCTVDRAINS
110
111
SNAGGING
111
112
BUILDINGCONTROLFINAL INSPECTIONS
112
113
CLEANING
113
114
TRAINING
114
115
HANDOVER
115
116
Externals
116
117
NEW INCOMMINGSERVICES
117
118
FOULDRAINCONNECTION
118
119
STORMDRAINCONNECTION
119
120
TIMBERFENCING
120
121
TEGULAPAVING
121
122
TOPSOIL
122
123
TURF/SEEDING
123
124
REMOVEFENCING/SCREENING
124
125
CLIENTDECANTSFROMTEMPORARYACCOMODATION
125
126
GoodacreStructure (Section 3A)
126
127
SETUPWORKINGAREA
127
128
INSTALLPROTECTION /TEMPORARYSCREENS
128
129
SURVEYEXISTINGSERVICES
129
130
TEMPORARYSIGNS
130
131
ARRANGEFIREEXITS
131
132
ISOLATESERCICESTOOFFICE/DEMOLITIONAREA
132
133
REMOVELIGHTING/FITTINGS
133
134
REROUTESERVICES
134
135
TEMPORARYPROPPING
135
136
REMOVEWALLS
136
137
EXCAVATEFLOOR
137
138
NEWCONCRETEBASES/BOLTS
138
139
PADSTONES
139
140
INSTALLSTEELWORK
140
141
PLUMB/LINE/GROUTBASES
141
142
FIREPROTECTIONTOSTEEL
142
143
1STFIXELECTRICS
143
144
1STFIXMECHANICAL
144
145
ADJUSTPLUMBING
145
146
GoodacreFinishes (Section 3B)
146
147
REMOVECORRIDORWALL / INSTALLTEMPORARYSCREENS
147
148
MAKEGOODFLOORS/WALLS
148
149
HEATING/COOLINGELEMENTS
149
150
PLASTERETC
150
151
2NDFIXELECTRICAL
151
152
2NDFIXMECHANICAL
152
153
TESTPIPEWORKABOVECEILING/LAGGING
153
154
SUSPENDEDCEILINGGRID
154
155
LIGHTSGRILLSCASSETTESETC
155
156
CEILINGTILES
156
157
FORMACCESSFORHOTELEXTENSION
157
158
DECORATIONS
158
159
FLOORFINISHES
159
160
TEST&COMMISSION
160
161
CLEANING
161
162
SNAGGING
162
163
HANDOVER
163
164
HotelExtension
164
165
Excavate footings /bases
165
166
Install clay boards
166
167
Tie footings toexisting
167
168
Reinforcement to foundations
168
169
Concrete to foundations
169
170
Substructure brickwork
170
171
Lightening protection
171
172
Fill cavity andwall starters
172
173
Drainage to footprint
173
174
Beamand block togrd floor includinggrout
174
175
Deliveryofstone cills
175
176
Deliveryofhead formers
176
177
Superstructurebrickwork andblock to 1st floor
177
178
Scaffoldperiod
178
179
Scaffolding
179
180
Lintelsand padstones
180
181
Structural steel
181
182
PreCast floor units
182
183
Pre caststairs
183
184
Superstructurebrickwork& block towall plate
184
185
Lintelsand padstones
185
186
Roofsteel
186
187
Roof installationcrash deck
187
188
Roof installation
188
189
Completegables
189
190
Boarding to flat roof section
190
191
Lathand felt roof
191
192
Roof tiling /leadwork
192
193
Single ply roofing
193
194
Facias ,barge& gutter
194
195
Parapetwalls
195
196
Parapetcopings
196
197
Windows/externaldoors
197
198
Scaffoldadaptions
198
199
Render
199
200
Decorationof render
200
201
RWP downpipes
201
202
Removalof scaffold
202
203
Floorscreed toground floor
203
204
Floorscreed to1st floor
204
205
Internalwalls ground floor
205
206
Install door frames/1st fix joinery
206
207
Internalwalls 1st floor/1st fix joinery
207
208
Install door frames
208
209
1st fix electrical ground floor
209
210
1st fix electrical 1st floor
210
211
Pipeand ventilationaboveceilingground floor
211
212
Pipeand ventilationaboveceiling1st floor
212
213
Testand lag aboveceilings
213
214
MFceilings togrd floor
214
215
MFceilings to1st floor
215
216
Plasterboard etc to grd floor
216
217
Plasterboard etc to 1st floor
217
218
Insulation to roofvoid
218
219
Boarding to loft
219
220
M&E installation to roof void
220
221
2nd fixelectrical
221
222
2nd fix joinerygrd floor
222
223
2nd fixmechanical
223
224
2nd fix joinery1st floor
224
Plantroom installation
225
IPS framing
225
226
Ceramic tiling
226
227
Floor finishes towetareas
227
228
IPSpaneling
228
229
Install sanitaryware
229
230
Timber staircase to entrance
230
231
Handrail /newel/balustrade
231
232
Metalhandrail to pc stair
232
233
Glass infil panels
233
234
Decoration
234
235
Laminate flooring
235
236
Receptiondesk ,counter, shelves
236
237
RemoveTempscreens
237
238
Floor finishes
238
239
Signage
239
240
Testand commission
240
241
Clean
241
242
Snagand de snag
242
243
Sparkleclean
243
244
Externaldrainage
244
245
GabionBase
245
246
Erectgabions
246
247
Backfill togabions
247
248
Topsoil
248
249
Turfing
249
250
LATESTDATEFORASBESTOSSURVEYTOLODGE
250
251
TEMPORAYSTAFFACCOMODATION
251
252
CLIENTDECANTFROMLODGE
252
253
DEMOLITIONOFLODGE (Section 8)
253
254
NewHouses andApartments
254
255
ISOLATEEXISTINGSERVICES
255
256
FURTHERNON INTRUSIVESURVEY
256
257
REMOVE /PROTECTTREES
257
258
REMOVEO/HEADBTWIRES/POLES
258
259
PROTECTEXISTINGGAS&ELECSUBSTATIONS
259
260
REMOVEEXISTINGBINSTORE
260
261
REMOVECONCRETESLABS
261
262
STRIPEXISTINGCARPARL/KERBSETC
262
263
REMOVEFENCING
263
264
DEMOLISHEXISTINGWALLS
264
265
REMOVESHRUBS/PLANTS
265
266
REMOVE/PROTECTTREES
266
267
STRIP/STORETOPSOIL
267
268
REDUCELEVELSTOBUILDING /ROAD
268
269
STONETOROAD
269
270
CBRTESTS
270
271
EXCAVATEFOOTINGS
271
272
INSTALLCLAYBOARDS
272
273
REINFORCEMENT
273
274
BUILDING INSPECTOR
274
275
CONCRETETOFOOTINGS
275
276
SUBSTRUCTUREBRICK/BLOCK
276
277
INSTALLFLOORVENTS
277
278
DRAINAGETOGROUNDFLOOR
278
279
BEAM&BLOCKFLOORING
279
280
GROUTBEAM&BLOCKFLOORING
280
281
SCAFFOLD/LOADINGBAYS /EXTHEKISTAIRS
281
282
SUPERSTRUCTUREWALLS
282
283
CONCRETESTAIRS
283
284
SCREEDTOGROUNDFLOOR
284
285
INTERNALWALLS/LINTELS
285
286
PLYWALLPATRESSES
286
287
JOISTSTOFIRSTFLOOR
287
288
PARTCONCRETEFIRSTFLOOR
288
289
BOARDINGTOFIRSTFLOOR
289
290
SUPERSTRUCTUREFIRSTTOWALLPLATE
290
291
STONESILLS
291
292
BRICKARCHES
292
293
THERMABATEFORMERS
293
294
PADSTONES
294
295
STEELSTOROOFLEVEL
295
296
WALLPLATES
296
297
CRASHDECK/FALLARREST
297
298
INSTALLROOFTRUSSES
298
299
ROOFCONSTRUCTIONTODORMERS
299
300
PARTYWALLGABLES
300
301
GABLESTODORMERS
301
302
ROOFBRACING/STRAPS
302
303
ROOF INSULATION
303
304
FASCIAS/SOFFITS
304
305
ROOF LIGHTS
305
306
ROOFCOVERINGS
306
307
INSTALLGUTTERS
307
308
INSTALLEXTERNALWINDOWS
308
309
EXTERNALDOORS
309
310
EXTERNALRENDER
310
311
EXTERNALPORCHES /UNDERBOARDING
311
312
RAINWATERDOWNPIPES
312
313
EXTERNALLIGHTS
313
314
DECORATERENDER
314
315
INTERNALWOODSTAIRS
315
316
FIRSTFIXELECTRICAL
316
317
CAT 6 INFASTRUCTURE
317
318
FIRSTFIXJOINERY
318
319
TESTPIPEWORK/LAGGING
319
320
INSULATEDPLASTERBOARDTOFIRSTFLOOR
320
321
PLASTERBOARDTOPARTITIONS
321
322
PLASTERBOARDSKIM
322
323
INSTALLBOILERS/HEATING
323
324
INTERNALDOORS/IRONMONGERY
324
325
VENTILATION/EXTRACT
325
326
SKIRTINGS/ARCHITRAVES
326
327
FLOORINGTOBATHROOMS
327
328
INSTALLSANITARYWARE
328
329
PIPEWORKABOVEFLOORS
329
330
INSTALLKITCHENS
330
331
CERAMICTILING
331
332
MIRRORS /SIGNS
332
333
DECORATIONS
333
334
FIXTURES&FITTINGS
334
335
HANDRAILSTOSTAIRS
335
336
LAMINATEFLOORING
336
337
CARPETS
337
338
BUILDING INSPECTOR
338
339
AIR/SOUNDTESTS
339
340
TEST&COMMISION
340
341
CLEANINGSNAGGING
341
342
HANDOVER
342
343
Externals
343
344
INCOMMINGSERVICES
344
345
REVIEWSTONETOROADS
345
346
EXTERNALFOULDRAINAGE
346
347
EXTERNALSTORMDRAINAGE
347
348
EXTERNALLDUCTS
348
349
KERBS/GULLIES
349
350
FORMFOOTPATHS
350
351
PERMEABLEBLOCKPAVING
351
352
CCTV SURVEYS
352
353
TOPSOIL
353
354
TURFING
354
355
BOLLARDLIGHTING
355
356
FENCING
356
357
RENOVESITECOMPOUND
357
358
SNAGGING
358
359
HANDOVER
359
REMOVEWELFAREANDCOMPLETECARPARKANDACCESSWORKS (Section 6A )
360
360
361
MOVESITECOMPOUNDTOHOUSESAREA&REDUCE
361
362
TEMPORARYWELFAREUNIT
362
363
REMOVEEXISTINGBUILDINGS
363
364
REMOVEEXISTINGCONCRETEBASES
364
365
CLEARVEGITATION
365
366
REMOVEHEDGE/FENCING
366
367
REMOVE/STORETOPSOIL
367
368
REDUCELEVELS
368
369
STONETOCARPARKAREAS
369
370
KERBS/GULLIES
370
371
REMAINDEROFSTORMDRAINAGE
371
372
INSTALLDUCTS
372
373
FORMPATHS
373
374
LIGHTINGBOLLARDS
374
375
LAYBLOCKPAVING
375
376
LAYTARMAC
376
377
FENCING
377
378
TOPSOIL
378
379
TURFING
379
380
REMOVETREEPROTECTION
380
381
REMOVEFENCING
381
382
SNAGGING
382
383
HANDOVER
383
384
REMOVEEXISTINGCONCRETEBASES
384
385
Handover
385
TradesContractor
Default
Default
Notes: Comment - Chart Properties
Dwg No. C00
Revision No. B
Drawn by: Planner - Chart Properties
Project Ref. S:\Construction Services Projects\PROJECT SPECIFIC\CURRENT PROJECTS\C00363 Quorn Grange\7 Contracts Managment\1 Programmes\1 Programmes\Progress\181015 progress.pp
Planned by Asta Powerproject