Task Description (NS)
BPMilestone (written key)
Permit issued, structurals selected
1
Start Pack Received
Start Pack Received
Pool Stakeout
Pool Stakeout
Pool Dig
Pool Dig/Form/Steel
Pool Gunite
Pool Gunite
Lot Grubbed/Balanced
Homesite Clear/Balance Lot Grubbed/Balanced Pre-Construction Meeting Survey Pinning/Stakeout
Lot Grubbed/Balanced
Pre-Construction Meeting
Stakeout
JBST (Dig Footers/Formboards)
Dig Footers/Formboards/Foundation [JBST]
Footer Steel
Footer Steel
Form Basement Walls
Form Basement Walls Basement Walls Poured Waterproof Basement Basement Walls Framed Underground Plumbing HVAC Underground Electric Underground
Basement Walls Poured
Waterproof Basement
Basement Walls Framed
Install Foundation Masonry Piers
Install Foundation Masonry Piers
Plumbing Underground
HVAC Underground
Electric Underground
Slab Steel Prep
Slab Steel Prep
Stem Wall Complete
Stem Wall Complete
Foundation Pour
2
Foundation Pour
Deliver Framing/Rough Lumber
Deliver Framing/Rough Lumber Foundation Floor Framing Complete
Foundation Floor Framing Complete
Stucco Grade Complete
Stucco Grade Complete
1st Flr Block/Framing Complete
1st Flr Block/Framing Complete Prep/Steel 1st Floor Beam
Prep/Steel 1st Floor Beam
Pour 1st Floor Beam
Pour 1st Floor Beam Floor Trusses Installed 2nd Floor Deck Complete 1st Floor Stairs Installed
Floor Trusses Installed
2nd Floor Deck Complete
1st Floor Stairs Installed
Stairs Installed
Stairs Installed
2nd Flr Block/Framing Complete
2nd Flr Block/Framing Complete Prep/Steel 2nd Floor Beam
Prep/Steel 2nd Floor Beam
Pour 2nd Floor Beam
Pour 2nd Floor Beam
Wall Sheathing
Wall Sheathing
Floor Trusses Installed - 3rd Floor
Floor Trusses Installed - 3rd Floor
3rd Floor Deck Complete
3rd Floor Deck Complete