The UK Offshore Oil and Gas Fabricators Directory 2014
Projects and Markets (continued)
Andrew Process Platform Client:
BP Exploration Operating Co. Ltd
Contract:
Fabrication
Completion Date: Structure: Weight Topside:
2012
Wellhead platform and jacket
750 tonnes Size (Length x Width x Height) Topside:
18 x 13 x 28 metres
Ensign Platform Client:
Centrica Energy
Contract:
Engineering, procurement and construction (EPC)
Completion Date:
2011
Structure:
Wellhead platform and jacket
Weight Topside:
500 tonnes
Jacket: 500 tonnes Size (Length x Width x Height) Topside:
16 x 12 x 8.5 metres
Jacket:
20 x 20 x 48 metres
>
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2014
page 63
Made with FlippingBook - professional solution for displaying marketing and sales documents online