Prepared for AK Steel

Larry sent a package with SorbIts ® samples, along with the AK Steel Product Portfolio attached in this email to Dave Miracle’s attention. Garrett worked with Kelly to get approved to install the trial in Coshocton. Larry had been reaching out to both Dave and Jennifer for some feedback/follow up. Nothing solid ever occurred. Garrett learned Jennifer is no longer involved on the absorbent side of the business and we needed to establish contact with the Todd Heggie. Dave Snyder and Larry meet with Todd to discuss product offerings and methods to proceed. Larry continued trying to work with Todd, but was never able to establish additional contact for follow-up. Garrett continued working with Kelly to try and get us into Coshocton. Larry worked with Samantha at corporate AK Steel to ensure that our master agreement certification was still valid. It was and it still is. Larry sent the attached Product Portfolio document to Jennifer’s attention so that she could be more familiar with our products. Larry worked with Samantha Frazier to get ITU AbsorbTech certified. The goal was to grant us access to your facilities to install trial product. We completed and signed off on the “AK Steel Corporation Contractor and Service Providers Master Agreement no. 4377R.” Matt Zabik (AK Steel GM of Procurement) signed from the AK Steel side. AK Steel / ITU AbsorbTech History

May 2015

July 2015

September 2015 December 2015

Spring 2016

Summer 2016

Made with