Quality Management 2017
A NALYZE
14. Control charts building: calculation of control limits
• Control limits (= natural limits of the process = “voice of the process”) : Process’s production is not always identical Mean
Part 1 :
Introduction to SPC
Mean - 3
Mean + 3
Normal distribution (central limit theorem )
LCL
UCL
Control lim
Control lim
Part 2 :
Natural dispersion
0.135%
0.135%
Essential concepts to start with SPC
To be checked.
= risk
= risk
> 99%
A point falls outside the natural limits special cause with certain risk (0.27%) common causes
Part 3 :
• Analysis of control charts Carte de contrôle des valeurs individuelles
SPC in practice
3,0%
3 potential special causes
2,5%
UCL
2,0%
1,5%
Part 4
1,0%
Mean
Details of limits’ calculation
X
0,5%
Conclusion
0,0%
6 points
-0,5%
LCL
Individual Value (%)
• Book of M. Pillet, Appliquer la Maitrise Statistique des Processus (2005)
-1,0%
9 points
-1,5%
0 10 Monitored parameter
20
30
40
• Thesis K. Gérard (2008)
Patient number Data (chronological order)
• ESTRO Practical exercise, Torino (2015) • T. Pawlicki, SPC for radiotherapy QA (2005)
03/10/17
Made with FlippingBook - Online Brochure Maker