“ KESC selected GE’s Jenbacher gas engines because they have a proven track record in Pakistan with the capability for rapid installation. Furthermore, GE also has the manu- facturing capacity to meet our needs for such a large number of engines in a very short period of time,” said Tabish Gauhar, CEO of KESC.

GE’s Jenbacher Gas Engines Power Plant, Karachi, Pakistan “ Fast Track” Gas Engines Power Plant to Bridge Demand-Supply Gap and Provide Affordable Energy

Fast track turnkey project within existing plant Won the Asian Power Plant Gold & Silver Award

Karachi Electric Supply Company (KESC) is using 64 of GE’s Jenbacher gas engines to supply 180 MW of urgently needed power to the local grid. GE’s Jenbacher gas engines have helped KESC bridge the demand-supply gap, enabling the company to manage their load as per their distribution policy. KESC installed 32 of GE’s J620 natural gas-fueled engines in each of two power plants in Karachi.