Caterpillar Performance Handbook, January 2017, SEBD0351-47

Lifting Capacities ● MH3022 (Grenoble Sourced)

Material Handlers

Lift Capacities All values are in kg, bucket cylinder and linkage installed, without bucket, with counterweight (4200 kg), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

Standard

5.35 m MH

4.2 m Straight Stick

3000 mm

4500 mm

6000 mm

7500 mm

9000 mm

mm

Undercarriage configuration Front stabilizerand reardozerup Front stabilizerand reardozerdown

*8550

6700

*5750

4200

*8550 *8550 *8550

*5750 *5750 *5750

2 sets stabilizersup 2 sets stabilizersdown

*8550 *8550 *8550

6750

*5750 *5750 *5750

4250

5900

9000mm

*8550

*5750

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

6700

4200

*8550 *8550 *8550

*5750 *5750 *5750

5800

4250

4000

2900

*8250 *8250 6650

*5100 *5100 4650

2 sets stabilizersup 2 sets stabilizersdown

5950

4300 7950 4250

4150

2950

7500mm

7380

*8250

*5100

*5100

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

6000

4150

2900

*8250 *8250 6800

*5100 *5100 4750

5750

4200 3950

2850

3250

2350

*8600 *8600 6600 *7300 *7300 4550

*4800 *4800 3800

2 sets stabilizersup 2 sets stabilizersdown

5900

4250 4050 7900 *7300 4200 4100

2900 5400 2850

3350

2350 4500 2350

6000mm

8340

*8600

*4800

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

5950

3400

*8600 *8600 6800 *7300 6500 4650

*4800 *4800 3850

9

9100

6500 5600

4100 3900

2800

2850

2050

*11 100 *11 100 10 550 *8900 *8900 6500 *7350 *7350 4500

*4750 *4750 3350

2 sets stabilizersup 2 sets stabilizersdown

9350

6550 5800

4100 4000 7750 *7350 4100 4050

2850 5350 2800

2950

2050 4000 2050

4500mm

8940

*11 100

*11 100 *8900

*4750

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

9400

6500 5800

3000

*11 100 *11 100 10 850 *8900 *8900 6650 *7350 6450 4600

*4750 *4750 3400

18 000

11 550 8600

6050 5400

3850 3750

2700 2800

1950 2650

1850

*18 000 *18 000 *18 000 *12 250 *12 250 10 000 *9300 *9300 6250 7400 7250 4400 5450 5400 3250 *4850 *4850 3100

2 sets stabilizersup 2 sets stabilizersdown

*18 000 *18 000 *18 000

11 700 8850

6100 5550

3900 3900 7500 *7400 3850 3900

2750 2900 5250 5600 2700 2900

2000 2750 3900 *4850 1950 2750

1900 3700 1850

9260

3000mm

*18 000 *12 250

*12 250 *9300

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

11 550 8900

6050 5600

*18 000 *18 000 *18 000 *12 250 *12 250 10 300 *9300 9200 6400 *7400 6350 4500 *5750 4700 3350 *4850 4500 3200

*11 900

10 150 8050

5550 5150

3650 3650

2600 2750

1950 2600

1800

*11 900 *11 900 *11 900 *12 950 *12 950 9450 *9450 *9450 6000 *7250 7100 4250 *5300 *5300 3200 *4750 *4750 3050

2 sets stabilizersup 2 sets stabilizersdown

*11 900 *11 900 *11 900

10 300 8250

5600 5300 11 650 *9450 5550 5350

3700 3750 7200 *7250 3650 3800

2600 2850 5100 *5300 2600 2850

1950 2700 3850 *4750 1950 2700

1850 3650 1800

1500mm

9320

*11 900 *12 950

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Front stabilizerand reardozerup Front stabilizerand reardozerdown

10 150 8300

*11 900 *11 900 *11 900 *12 950 *12 950 9700 *9450 8900 6150 *7250 6200 4350 *5300 4650 3300 *4750 4400 3100

*6250

*6250 7600

5200 4950

3450 3550

2500

*6250 *6250 *6250 *12 250 *12 250 9000 *8900 *8900 5800 *6600 *6600 4150

2 sets stabilizersup 2 sets stabilizersdown

*6250 *6250 *6250

*6250 7850 *6250 *12 250 *6250 7900

5250 5100 11 200 *8900 5200 5150

3500 3650 7000 *6600 3450 3700

2550 5000 2500

0mm

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown Frontstabilizerand reardozerup Front stabilizerand reardozerdown

*6250 *6250 *6250 *12 250 *12 250 9300 *8900 8650 5900 *6600 6050 4250

7450

5000 4800

3350

*9850 *9850 8800 *7300 *7300 5650

2 sets stabilizersup 2 sets stabilizersdown

7700

5100 5000 *9850 *7300 5000 5000

3400 6900 3350

–1500mm

*9850

Frontdozerand rear stabilizerup Frontdozerand rear stabilizerdown

7750

*9850 *9850 9100 *7300 *7300 5800

*Limited by hydraulic rather than tipping load. Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance. Always refer to the appropriate Operation and Maintenance Manual for specific product information.

Edition 47 9-45

Made with