neocube Operating and installation instructions - models P/C

7. Installation instructions

Scope of delivery ƒ ƒ Heating technology with firebrick lining ƒ ƒ Ceramic cladding with internal construction ƒ ƒ Steel top plate ƒ ƒ Oven glove ƒ ƒ Other accessories ƒ ƒ A4 cover with: Fixing material, ƒ ƒ Operating and installation instructions

Example picture

Example picture

Example picture

Unpacking the goods When unpacking the goods, make sure that your cutting tools (blades, cutting knives, scissors, etc.) do not cause any damage. Transporting the components to the site of installation ƒ ƒ When transporting the goods, make sure that your hands/gloves are clean. ƒ ƒ Never place the ceramic elements near sharp edges or corners. ƒ ƒ Never push or pull the ceramic elements along the floor or ground (risk of scratching). ƒ ƒ Always carry the ceramic elements to the site of installation, never use carts etc. to transport them. ƒ ƒ The heating technology should only be transported in the upright position or slightly tilted on its back; never pick it up from the door side. ƒ ƒ Only transport the heating technology with the fire compartment door closed.

The following pictures of the detailed assembly steps are shown on a P10 model.

neocube P / C – Operating and installation instructions

14

Made with FlippingBook flipbook maker