ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

POLAND

/1* )

/1* WHUPLQDO LQ ĝZLQRXMĞFLH

),'

LNG Terminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

Priority Project No GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

Interested by PCI ? IGAs

None

Web Link

en.gaz-system.pl/terminal-lng/

Gas Transmission Operator GAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

Regasification facility Expected volume (bcm/y) Total CS Power (MW) Send-out (mcm/d)

Regulated Regulated

>E' ƚĞƌŵŝŶĂů ŝŶ _ǁŝŶŽƵũƑĐŝĞ +5,00

FID Construction Commissioning Last completed Phase :

2010

No

+320.000,00 +13,68 216.000,00

Not relevant

2014

Ship size (m3) Reloading ability ?

% Exemption in entry direction % Exemption in exit direction

0%

FID

0%

No

| 129

GRIP Central Eastern Europe 2014–2023 Annex B