ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
POLAND
/1* )
/1* WHUPLQDO LQ ĝZLQRXMĞFLH
),'
LNG Terminal
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Priority Project No GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.
Interested by PCI ? IGAs
None
Web Link
en.gaz-system.pl/terminal-lng/
Gas Transmission Operator GAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
Regasification facility Expected volume (bcm/y) Total CS Power (MW) Send-out (mcm/d)
Regulated Regulated
>E' ƚĞƌŵŝŶĂů ŝŶ _ǁŝŶŽƵũƑĐŝĞ +5,00
FID Construction Commissioning Last completed Phase :
2010
No
+320.000,00 +13,68 216.000,00
Not relevant
2014
Ship size (m3) Reloading ability ?
% Exemption in entry direction % Exemption in exit direction
0%
FID
0%
No
| 129
GRIP Central Eastern Europe 2014–2023 Annex B