ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
POLAND
TRA-N-276
8SJUDGH RI WKH HQWU\ SRLQWV LQ /ZyZHN DQG :áRFáDZHN RQ WKH Non-FID Pipeline including CS SPONSORS GENERAL INFORMATION FINANCING Promoter Operator TEN-E Project ? Not part of TEN-E Yes GAZ-SYSTEM S.A. GAZ-SYSTEM S.A. Interested by PCI ? IGAs None Web Link Gas Transmission Operator GAZ- SYSTEM S.A. (100%) THIRD-PARTY ACCESS REGIME SCHEDULE TECHNICAL INFORMATION Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime End of permitting phase # of Pipelines, nodes, CS Total Pipeline Length (km) Regulated Regulated 2 FID Construction Commissioning Last completed Phase : Total CS Power (MW) Expected Load Factor No Not relevant 2015 % Exemption in entry direction % Exemption in exit direction 0% Planned 0% | 139 GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook