ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

POLAND

TRA-N-276

8SJUDGH RI WKH HQWU\ SRLQWV LQ /ZyZHN DQG :áRFáDZHN RQ WKH

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-E Project ?

Not part of TEN-E Yes GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

Interested by PCI ? IGAs

None

Web Link

Gas Transmission Operator GAZ- SYSTEM S.A. (100%)

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

End of permitting phase

# of Pipelines, nodes, CS Total Pipeline Length (km)

Regulated Regulated

2

FID Construction Commissioning Last completed Phase :

Total CS Power (MW) Expected Load Factor

No

Not relevant

2015

% Exemption in entry direction % Exemption in exit direction

0%

Planned

0%

| 139

GRIP Central Eastern Europe 2014–2023 Annex B

Made with