ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
POLAND
TRA-F-248
Upgrade of gas infrastructure in northern and central Poland
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Not part of TEN-E No GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.
Interested by PCI ? IGAs
None
en.gaz-system.pl/nasze-inwestycje/krajowy-system- przesylowy/
Web Link
Gas Transmission Operator GAZ- SYSTEM S.A. (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
5 +875,00
FID Construction Commissioning Last completed Phase :
2007
Total CS Power (MW) Expected Load Factor
No
Not relevant
2014
% Exemption in entry direction % Exemption in exit direction
0%
FID
0%