ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

BULGARIA

PROJECTED CAPACITY INCREASES

Interconnection

Capacity (GWh/d)

From Zone

To Zone

Modelled Direction Yes entry

South Stream into Bulgaria (BG)

62,10

South Stream (Russia)

Hub Bulgaria (NGTS)

DESCRIPTION OF THE PROJECT

Second stage of the South Stream interconnection to the Bulgarian network, as understood by ENTSOG based on e-mail exchange.

EXPECTED BENEFITS

COMMENTS ABOUT THE PROJECT FINANCING

Public financing

Private financing

Multilateral financing

| 27

GRIP Central Eastern Europe 2014–2023 Annex B

Made with