ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
GERMANY
TRA-F-292
Installing a reverse flow in Mallnow
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
GASCADE Gastransport GmbH GASCADE Gastransport GmbH
Not part of TEN-E No
Interested by PCI ? IGAs
None
Web Link
GASCADE (100%)
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
2013
FID Construction Commissioning Last completed Phase :
2013
Total CS Power (MW) Expected Load Factor
Not relevant
2013 2014
Not relevant
% Exemption in entry direction % Exemption in exit direction
0%
Permitting
0%
| 65
GRIP Central Eastern Europe 2014–2023 Annex B