ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
GERMANY
System enhancements, including the connection of gas-fired power plants, storages and the integration of power to gas facilities
TRA-N-243
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Open Grid Europe GmbH Open Grid Europe GmbH
Not part of TEN-E Not defined yet
Interested by PCI ? IGAs
None
Web Link
ǁǁǁ͘ŽƉĞŶͲŐƌŝĚʹĞƵƌŽƉĞ͘ĐŽŵ
K' ;ϭϬϬйͿ
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Not applicable Not applicable
FID Construction Commissioning Last completed Phase :
2020
Total CS Power (MW) Expected Load Factor
Not relevant
Not relevant
2020
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 87
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook