Ideal Standard Installer flyer_English

Installation ProSys ™ 120 frame

2

1

1 Set the frame to height using the 1m height guide above the finished floor level.

2 Fix the frame to the floor and wall and adjust the EasyFix TM brackets to make sure the frame is level with the wall.

5

6

5 Remove and recycle the debris guards, and cut the flush and waste pipes to length, taking into account the wall and bowl depths.

6 Mount the bowl onto the threaded bars. Make sure the bowl is perfectly level. This can be done with the fixing pack provided for exposed bowls, or with wthe concealed fixation provided with the bowl.

Made with FlippingBook Ebook Creator