Table of Contents Table of Contents
Previous Page  1008-1009 / 1143 Next Page
Information
Show Menu
Previous Page 1008-1009 / 1143 Next Page
Page Background

Copyright © Risknowlogy®. All rights reserved. v9

Do you have an effective monitoring system

You need to have in place recording systems for:

Of Proof Test results (A dangerous failure on a proof test is a Near Miss)

Of operator response

Of bypass durations

Of demands (Another Near Miss)

etc

And then you need to analyse the data

And respond

This is plan > do > review

This will be checked by a Stage 4 Functional Safety Assessment

You also need a way of recording and responding to FSA findings

15