Table of Contents Table of Contents
Previous Page  334 / 1143 Next Page
Information
Show Menu
Previous Page 334 / 1143 Next Page
Page Background

Functional Safety 2016

November, 2016 - London

Page 4 of 17

Methodology to determine Proof Test Coverage

The definition of the Proof Test Coverage Factor (C

PT

) is the percentage of dangerous failures

detected by the Proof Test usually in relation to the undetected dangerous failures, where

internal diagnostics are available.

The BS EN 61511:2004, UK HSE and EEMUA 22 guidance provides little technical guidance on

methodology, therefore the assessment is usually carried out as a combination of a review of

the proof test procedures with a comparison against the available guidance and vendor

recommendations.

The UK HSE is clear that partial (imperfect) proof testing must be accounted for in the hardware

calculations and SPC/Technical/General/48 and CRR 428/200 provides some guidance.

The methodology for the identified SIF Loops is:

1. Review the Safety Requirements Specification (SRS) to identify specific loop

components and equipment model / type.

2. Source the vendor Safety Manual for the equipment model / type and identify any

specific testing requirements and any coverage claims.

3. Review the PT procedure for the identified SIF Loop.

4. Review the SIL hardware assessment report with respect to test coverage claims and

failure rate data used.

5. Assess the current C

PT

based on the proposed testing regime in comparison to vendor

and UK regulator expectations and requirements.