16 |
Central Eastern Europe GRIP 2017
INVESTMENT PROJECTS COMMISSIONED AFTER THE PUBLICATION
OF THE CEE GRIP 2014–2023
PROJECT PROMOTER PROJECT NAME
CODE
Bulgartransgaz EAD
Romania–Bulgaria Interconnection (EEPR-2009-INTg-RO-BG)
TRA-F-57
1)
eustream, a.s.
Slovakia–Hungary interconnection
TRA-F-016
Exit Capacity Budince
TRA-F-1047
2)
GASCADE
Gastransport GmbH
Installing a reverse flow in Mallnow
TRA-F-292
Installation of Nord Stream onshore project
TRA-F-289
Extension of GASCADE grid in the context of the Nord Stream (on-shore) project
TRA-N-249
Gasunie Deutschland
Transport Services
GmbH
Extension of existing gas transmission capacity in the direction to Denmark – 1. Step TRA-F-231
Extension of existing gas transmission capacity in the direction to Denmark – 2. Step TRA-N-232
GAZ-SYSTEM S.A.
Physical reverse flow on the metering station in Mallnow
TRA-F-326
Upgrade of gas infrastructure in northern and central Poland
TRA-F-248
Upgrade of the entry points in Włocławek on the Yamal-Europe pipeline
TRA-N-276
LNG terminal in Świnoujście
LNG-F-246
Increase of reverse capacity at Mallnow interconnection point
TRA-F-893
Physical reverse capacity at Lasów interconnection point
TRA-F-897
Magyar Gáz Tranzit ZRt.
Slovak-Hungarian interconnector (Vecsés–Szada–Balassagyarmat)
TRA-F-148
Plinovodi d.o.o.
CS Kidričevo (3
rd
unit 3.5 MW)
TRA-F-096
M2/1 Trojane – Vodice
TRA-F-097
M2/1 Rogaška Slatina – Trojane
TRA-F-104
MRS Šempeter – Reconstruction
TRA-F-110
SNTGN Transgaz S.A.
RO–BG Interconnection
TRA-F-029
terranets bw GmbH
Nordschwarzwaldleitung
TRA-N-228
1) This project was not in the CEE GRIP 2014–2023, but it was commissioned in November 2016.
2) This project was not in the CEE GRIP 2014–2023, but it was commissioned by the end of 2016
Table 2.1:
Investment projects commissioned after the publication of the CEE GRIP 2014 – 2023
The table below summarises investment projects that were included in the CEE
GRIP 2014–2023 and have been commissioned since the release of the last CEE
GRIP report in May 2014.