August 2016

4-2

City of Morgan Hill

2015 Urban Water Management Plan

Table 4-1 Demands for Potable and Raw Water –

Actual

Use Type

Metered Delivered

Volume

(AF)

Single Family

3,206

Multi-Family

581

Commercial

1

527

Landscape

1,064

Total

5,379

Notes:

1. Includes Commercial and Institutional use types.

4.2.2

Projected Water Use

Table 4-2

,

Table 4-3

, and

Table 4-3A

, found on the following pages, summarize the potable

water demand projection through the year 2040. To calculate the projected potable water demand

through the UWMP planning horizon of 2040, the City’s 2020 urban water use target 159 gallons

per capita per day (gpcd) was applied to the projected population set forth in the Draft 2016

General Plan Update. Table descriptions are as follows:

Table 4-2

summarizes the projected water demand by water use type

Table 4-3

summarizes the total projected water demand, which includes projected

recycled water demand

Table 4-3A

summarizes the projected annual population growth and the City’s

corresponding gross water use

In addition to the City’s potable water demand,

Table 4-2

and

Table 4-3

include demand

projections associated other users that rely on groundwater from the Llagas subbasin and Coyote

Valley subarea. These additional demands, based on estimates prepared by Santa Clara Valley

Water District (SCVWD), are included for completeness of the Llagas and Coyote Valley water

budget, discussed in greater detail in Chapter 6 and Chapter 7.