Table of Contents Table of Contents
Previous Page  40 / 185 Next Page
Information
Show Menu
Previous Page 40 / 185 Next Page
Page Background

August 2016

5-13

City of Morgan Hill

2015 Urban Water Management Plan

SB X7-7 Table 7-A Target Method 1

10-15 Year

Baseline

2020 Target

(gpcd)

(gpcd)

199

159

SBX7-7 Table 8 2015 Interim Target Per Capita Water Use

Confirmed 2020 Target 10-15 year Baseline

2015 Interim Target

(gpcd)

(gpcd)

(gpcd)

159

199

179

5.7.1

5-Year Baseline – 2020 Target Confirmation

Law

The 2020 Urban Water Use Target is required to reduce the City’s 2020 water use by a minimum

of 5 percent from the 5-year baseline period (2003-2007). As calculated in

SB X7-7 Table 5

, the

average per capita water use for the 5-year baseline period is 205 gpcd. The 2020 Urban Water

Use Target of 159 gpcd is an approximately 22% reduction from the 5-year average per capita

water use, thereby confirming the 2020 Urban Water Use Target (

SB X7-7 Table 7-F

).

SBX7-7 Table 7-F Confirm Minimum Reduction for 2020 Target

5 Year

Baseline GPCD

Maximum 2020

Target

1

Calculated

2020 Target

Confirmed 2020

Target

(gpcd)

(gpcd)

(gpcd)

(gpcd)

205

194

159

159

Notes:

1. Maximum 2020 Target is 95% of the 5-year Baseline per capita water use.

10608.22 Notwithstanding the method adopted by an urban retail water supplier pursuant to

section 10608.20, an urban retail water supplier’s per capita daily water user reduction

shall be no less than 5 percent of base daily per capita water use are defined in

paragraph (3) of subdivision (b) of Section 10608.12. This section does not apply to an

urban retail water supplier with a base daily per capita water use at or below 100

gallons per capita per day.